Energy Choice
                            

Matters

Archive

Daily Email

Events

 

 

 

About/Contact

Search

TNMP Drops Several Proposed New Riders, Charges Applicable To Retail Providers Under Rate Case Settlement

Eliminates AMS Surcharge, Significantly Reduces Most Discretionary Fees

Would Increase Flat Base Rate Monthly Fees For Residential Service By 50%, Also Increase Volumetric Charge


November 5, 2018

Email This Story
Copyright 2010-17 EnergyChoiceMatters.com
Reporting by Paul Ring • ring@energychoicematters.com

The following story is brought free of charge to readers by EC Infosystems, the exclusive EDI provider of EnergyChoiceMatters.com

Texas-New Mexico Power, Staff of the Public Utility Commission of Texas, the Alliance for Retail Markets, the Texas Energy Association for Marketers, Texas Industrial Energy Consumers, and the Office of Public Utility Counsel have filed a stipulation that would resolve TNMP's base rate case proceeding.

The stipulation drops several new riders and new (or increased) fees applicable to retail electric providers that had originally been proposed by TNMP in its initial application (see EnergyChoiceMatters.com's exclusive analysis of the proposals here).

The stipulation would adopt new Rider HCRF - Hurricane Cost Recovery Factor, though in a reduced amount versus TNMP's initial proposal. Final rates for Rider HCRF are not available as the final rates will reflect carrying charges, less excess amounts TNMP has been recovering in current rates due to reductions in federal tax obligation (and the final amounts for such impacts will not be set until the date the new rates take effect). TNMP will file a compliance filing with final Rider HCRF upon approval of the stipulation.

However, the stipulation did contain an attachment showing indicative amounts for Rider HCRF as follows:

Rider HCRF -- Indicative Rates, Not Final
Residential          $0.00014 per kWh
Secondary ≤ 5 kW     $0.00014 per kWh
Secondary > 5 kW
  Non IDR            $0.02828 per Billed kW
  IDR                $0.04644 per Billed kW
Primary Service
  Non IDR            $0.02429 per Billed kW
  IDR                $0.02596 per Billed kW
Transmission         $0.00009 per 4CP kVA
Lighting             $0.00037 per kWh

To compare these reduced HCRF rates to the originally proposed Rider HCRF rates, see our prior story here.

The stipulation does not include TNMP's proposed new Rider AVM - Rate Case Additional Vegetation Management rider. The rider would have included a charge of $0.00089 per kWh for residential customers and $0.00071 per kWh for Secondary ≤ 5 kW customers

Tariffs attached to the stipulation also do not include Rider RCE - Rate Case Expense; however, issues related to rate case expenses incurred in connection with the instant proceeding and Commission Docket Nos. 35038 and 41901 were severed into Commission Docket No. 48591.

As proposed by TNMP, the stipulation would eliminate the current Rider AMS – Advanced Metering Surcharge under the settlement, with recovery of remaining AMS costs placed into base rates. Rider AMS had only been a charge applicable to residential customers, equal to $3.40 per month

The stipulation also does not include the TNMP's proposed new Inadvertent Gain fee of $25. The new Inadvertent Gain fee would have been applicable to Retail Electric Providers that have selected an incorrect premise from the ERCOT portal for a switch or move-in and for which TNMP is required to correct the inadvertent gain.

Additionally, the stipulation does not adopt TNMP's proposal to include a $0.40 charge for a Meter Reading for Purpose of a Mass Transition (standard meter). Under the stipulation, a Meter Reading for Purpose of a Mass Transition (standard meter) will continue to be $0.

The stipulation would adopt the following reduced discretionary service fees (among others):

       Current Tariff      Stipulation
Move-In        $54          $1.50
  (Existing Standard Meter)

Move-In        $60          $36
  (New Standard Meter)

Disconnection for Non-Payment (DNP)
  at Meter     $9.67        $1.50

Reconnection After DNP
  at Meter     $9.67        $1.50

Meter Reading for Purpose of Self-Selected Switch
               $27          $0.40

Regarding new base rates, the stipulation's modified Transmission and Distribution Charges are as follows for residential customers (current charges also listed). The stipulation rates are marginally lower than TNMP's original proposal. Note the 50% increase in flat monthly charges and increase in volumetric charges.

Residential
Transmission and Distribution Charges:
         Current Tariff      Stipulation
Customer Charge   $4.00        $1.13   per month
Metering Charge   $1.25        $6.72   per month
Transmission      $0.00        $0.00   per kWh
Distribution      $0.017347    $0.025670 per kWh

For Secondary ≤ 5 kW customers, the stipulation would adopt the following TDU rates:

Secondary ≤ 5 kW
Transmission and Distribution Charges:
         Current Tariff      Stipulation
Customer Charge   $2.50        $0.74   per month
Metering Charge   $2.20        $7.62   per month
Transmission      $0.00        $0.00   per kWh
Distribution      $0.033323    $0.042580 per kWh

Docket 48401

ADVERTISEMENT
NEW Jobs on RetailEnergyJobs.com:
NEW! -- Director of Sales & Marketing -- Retail Supplier -- Houston
NEW! -- Sales Director -- Houston
NEW! -- Director of Sales
NEW! -- Energy Sales Representative
NEW! -- Manager Business Field Sales -- Retail Energy
NEW! -- Senior Energy Consultant
NEW! -- Supply Analyst -- Retail Supplier
NEW! -- Controller -- Retail Supplier -- Houston
NEW! -- Outside Sales Executive -- Retail Energy
NEW! -- Channel Sales Manager -- Retail Supplier
NEW! -- Sr Analyst, Supply and Pricing -- Retail Supplier -- Houston
NEW! -- Customer Retention Analyst -- Retail Supplier -- Houston

Email This Story

HOME

Copyright 2010-16 Energy Choice Matters.  If you wish to share this story, please email or post the website link; unauthorized copying, retransmission, or republication prohibited.

 

Archive

Daily Email

Events

 

 

 

About/Contact

Search