Filed Tariff Indicates TNMP Secondary < 5 kW Distribution Charge Would Fall To Under 5 Mills per kWh Under New TNMP Rate Case
The following story is brought free of charge to readers by VertexOne, the exclusive EDI provider of EnergyChoiceMatters.com
Texas-New Mexico Power Company has filed a new electric delivery rate case with the Texas PUC
TNMP's proposed distribution rates (not including riders) for residential customers and Secondary <= 5 kW customers are as follows:
The stated Secondary <= 5 kW Distribution System Charge of $0.004400 per kWh appears in multiple copies and versions of the tariff filed in the case (both clean and redline), and is consistent with the calculation from stated values for the class's proposed revenue requirement and usage appearing in several workpapers. However, ECM stresses that ECM is merely posting the number as it appears in TNMP's proposed tariff. Overall, for the Secondary <= 5 kW class, the filing indicates an approximately 50% lower revenue requirement versus current rates
While not citing the Secondary <= 5 kW class specifically, TNMP stated in the filing that the rate case reflects a
reassignment of costs across
customer classes based on cost causation to reduce current subsidies and bring all
classes toward equalized rates of return.
As illustrated above, for the Residential and Secondary <= 5 kW classes, TNMP proposed changes to the monthly customer charge and monthly metering charge that would result in a reduction in the combined flat monthly charge to REPs
For residential customers, the sum of the monthly customer charge and monthly metering charge would decrease to $7.32 per month, from the current $7.85 per month
For Secondary <= 5 kW customers, the sum of the monthly customer charge and monthly metering charge would decrease to $7.89 per month, from the current $8.36 per month
In the rate case, TNMP is requesting a five-year recovery of Hurricane Beryl O&M Costs through a rate
rider, Hurricane Cost Recovery Factor (Rider HCRF).
Rider HCRF is an existing, $0 rider in TNMP's tariff. TNMP would re-institute charges under Rider HCRF, Hurricane Cost Recovery Factor, as follows (no amounts are currently charged under the rider)
TNMP would also resume charges under its rate case expense rider, Rider RCE, as follows (no amounts are currently charged under Rider RCE)
TNMP also proposes changes in various Discretionary Service Charges, with decreases for certain services for standard meters, and increases for other services, including for new standard meters, and for standard meters at premium locations. Select proposed changes are noted below (some DSCs which are not being changed are also listed due to interest in there being no change):
Docket 58964
ADVERTISEMENT Copyright 2025 EnergyChoiceMatters.com. Unauthorized copying, retransmission, or republication
prohibited. You are not permitted to copy any work or text of EnergyChoiceMatters.com without the separate and express written consent of EnergyChoiceMatters.com
TNMP Would Decrease Flat Monthly Charges For Mass Market Customers; Some Discretionary Charges Also Lowered
November 14, 2025
Email This Story
Copyright 2025 EnergyChoiceMatters.com
Reporting by Paul Ring • ring@energychoicematters.com
TNMP Distribution Rates
Current Proposed
Residential
Customer Charge
per month $1.13 $1.52
Meter Charge
per month $6.72 $5.80
Distribution System Charge
per kWh $0.025670 $0.048010
Secondary <= 5 kW
Customer Charge
per month $0.74 $1.58
Meter Charge
per month $7.62 $6.31
Distribution System Charge
per kWh $0.042580 $0.004400[sic]
Rider HCRF New
Residential $0.000862 / kWh
Secondary <= 5 KW $0.000578 / kWh
Secondary > 5 KW $0.187613 / Actual kW
Primary $0.149962 / Actual kW
Primary Substation $0.000160 / Actual kW
Transmission $0.000025 / Actual kW
Lighting $0.000893 / kWh
Rider RCE New
Residential $0.000205 / kWh
Secondary <= 5 KW $0.000128 / kWh
Secondary > 5 KW $0.042029 / Actual kW
Primary $0.031652 / Actual kW
Primary Substation $0.020689 / Actual kW
Transmission $0.007596 / Actual kW
Lighting $0.000498 / kWh
TNMP Discretionary Service Charges
(charges are for existing standard meter,
non-premium location unless otherwise noted)
Current Proposed
Move-In
Existing Standard Meter 1.50 1.00
Move-In
New Standard Meter 36.00 54.00
Disconnection For Non-Payment (DNP)
Disconnection at Meter 1.50 1.50
Disconnection at
Premium Location 104.00 163.00
Reconnection After DNP
Reconnection at Meter 1.50 1.50
Reconnection at Premium Location
Standard Reconnect 101.00 145.00
Same Day Reconnect 236.00 353.00
Weekend 236.00 353.00
Holiday 340.00 515.00
Meter Reading for the Purpose of
a Self-Selected Switch
0.40 0 10
NEW Jobs on RetailEnergyJobs.com: