December 17, 2024
PSC Report: "Not Network" Co-Located PJM Load May Violate Utilities' Exclusive Franchise Rights
PSC Suggests Co-Located Load Be Required To Obtain Approval Similar To CPCN
"Not network" co-located loads and generation, under which the load is not designated as PJM Network load and is entirely served by co-located generation, may violate…
