June 12, 2026
Texas PUC Staff File Proposed Rule To Replace 4CP Transmission Cost With 12CP; Minimum Billing Demand For Large Loads
Staff of the Texas PUC have filed recommended proposed rule language to replace the current 4CP transmission cost assignment methodology with a 12CP methodology
