HomeOctober 7, 2026
State Sets Discussion Of Whether Additional TOU Options Should Be Offered To Non-shopping Customers, If Default Service Becomes An Opt-out TOU Rate
Copyright 2026 EnergyChoiceMatters.com.
The following story is brought free of charge to readers by VertexOne, the exclusive EDI provider of EnergyChoiceMatters.com
The Massachusetts DPU has issued an agenda for an October 21 to October 22 technical conference concerning the DPU's investigation of time-varying rates for electricity default service (basic service)
The DPU has said that it will "expeditiously" investigate the use of opt-out time of use rates for default service, after the Massachusetts Department of Energy Resources proposed that the default basic service rate be a two-tier TOU rate (peak and off peak) with a four-hour peak period of 4 PM to 8 PM, with the ability of the customer to opt out to another default service rate
See full details on DOER's TOU proposal in ECM's prior story here
Among other things, the technical conference will discuss whether additional, optional TOU rates should be offered to basic service customers in addition to the default TOU option
In particular, the offering of an opt-in Critical Peak Pricing (CPP) rate, or other opt-in TOU rates that are more "dynamic" than the opt-out TOU rate, will be discussed
The conference will also address whether a basic service CPP should be coordinated with existing demand response offerings (e.g., ConnectedSolutions), and if so, how. ConnectedSolutions allows the utilities to control smart thermostats and home batteries for enrollees
Additionally, the technical conference will discuss the rate design for basic service customers who opt-out of TOU
The conference is to address: "Should the EDCs maintain a flat, non-seasonal rate option consistent with current rates or some other rate design option(s) for customers who wish to opt-out?"
Stakeholders will also consider whether participation in ConnectedSolutions or a similar offering should be required for customers opting-out of TOU default service
The technical conference will also address any changes needed to the EDCs’ IT and billing systems and standard service procurements to implement time varying rates; and associated implementation timelines
Among other things, the EDCs are directed to describe the "fastest implementable option" for TVR, and provide the TVR design that could be implemented in the shortest timeframe, including the principal design elements and the estimated implementation timeline. This option should include TVR design elements that can be implemented as advanced meters are installed, but ahead of full advanced meter deployment, a hearing officer directed
Other issues to be discussed include the ratio between prices in TOU periods, the number of TOU periods and their times, and seasonality
Docket 26-62
You can follow specific tags with a free account and see their newest stories in one place. Sign up or sign in.
Copyright 2026 EnergyChoiceMatters.com. Unauthorized copying, retransmission, or republication prohibited. You are not permitted to copy any work or text of EnergyChoiceMatters.com without the separate and express written consent of EnergyChoiceMatters.com.

