ECM, Energy Choice Matters

Informing the Industry on What Truly Matters
in Retail Energy

Sign InRegister

HomeNovember 7, 2017

ERCOT Finds Luminant's Retiring Sandow, Big Brown Units Not Needed For Transmission System Reliability

Email This Story

Copyright 2017 EnergyChoiceMatters.com.

ERCOT issued a final determination that several Sandow and Big Brown generating units for which Luminant has announced retirement are not needed for transmission system reliability.

Specifically, ERCOT issued determinations that the following generation resources are not required to support ERCOT transmission system reliability:

• LUMINANT GENERATION COMPANY LLC (RE) – Sandow Unit 4 (SDSES_UNIT 4)

• SANDOW POWER COMPANY LLC (RE) – Sandow Unit 5 (SD5SES_UNIT 5)

• BIG BROWN POWER COMPANY LLC (RE) – Big Brown Unit 1 (BBSES_UNIT1) and Big Brown Unit 2 (BBSES_UNIT2)

With such determination, each of these resources may be decommissioned according to the schedule in their Notifications of Suspension of Operations.

The Notifications of Suspension of Operations filed by Luminant indicate that the two Sandow units will be decommissioned and retire permanently on January 11, 2018, and that the Big Brown units will be decommissioned and retire permanently on February 12, 2018.

The NSOs list the Seasonal Net Max Sustainable Rating (MW) of each of the four units as approximately 600 MW each

You can follow specific tags with a free account and see their newest stories in one place. Sign up or sign in.

Copyright 2017 EnergyChoiceMatters.com. Unauthorized copying, retransmission, or republication prohibited. You are not permitted to copy any work or text of EnergyChoiceMatters.com without the separate and express written consent of EnergyChoiceMatters.com.

Energy Search PartnersEnd of Story BannerBefore NewNow 728 × 90New slot. Directly under the article text, at peak attention.

More News

ERCOT Finds Luminant's Retiring Sandow, Big Brown Units Not Needed For Transmission System Reliability | EnergyChoiceMatters.com