HomeFebruary 16, 2018
Texas PUC To Open Rulemaking Concerning Loads Seeking To Join ERCOT
Copyright 2018 EnergyChoiceMatters.com.
Commissioners of the Texas PUC agreed yesterday to open a rulemaking to generically look at issues implicated from utilities seeking to join ERCOT
Chairman DeAnn Walker proposed such a rulemaking in discussing the application of Lubbock Power & Light to join ERCOT, which, as first reported by EnergyChoiceMatters.com yesterday (see story here), Commissioners are prepared and poised to approve
Regarding a generic rulemaking on loads moving to ERCOT, Walker said, "I think we need to move forward with that, because we're getting a lot of these."
Her fellow Commissioners agreed with this approach
Walker said that this week she had discussions with a party about another transfer that's on the, "horizon." Walker did not specifically identify the party involved in the potential load transfer.
Aside from LP&L, Rayburn Country Electric Cooperative, Inc. (RCEC) has proposed transitioning approximately 190 MW of load currently in SPP to ERCOT, in which the majority of its load is already located.
East Texas Electric Cooperative also recently filed for approval (see story here) for ETEC to transfer two wholesale delivery points, totaling 35 megawatts (MW) of load, into the Electric Reliability Council of Texas (ERCOT) from the Southwest Power Pool (SPP).
You can follow specific tags with a free account and see their newest stories in one place. Sign up or sign in.
Copyright 2018 EnergyChoiceMatters.com. Unauthorized copying, retransmission, or republication prohibited. You are not permitted to copy any work or text of EnergyChoiceMatters.com without the separate and express written consent of EnergyChoiceMatters.com.

