ECM, Energy Choice Matters

Informing the Industry on What Truly Matters
in Retail Energy

Sign InRegister

HomeAugust 27, 2018

AEP Texas Merger Savings Credit To REPs Takes Effect On Interim Basis

Email This Story

Copyright 2018 EnergyChoiceMatters.com.

The following story is brought free of charge to readers by EC Infosystems, the exclusive EDI provider of EnergyChoiceMatters.com

As previously reported, per the order in Docket No. 46050, AEP Texas filed for a merger savings credit Monday, February 26, 2018 in PUCT Docket No. 48110. In its application, AEP Texas proposed to refund the savings stemming from lower debt issuance costs.

The SAC Code on the 810 invoice will be RRR008 and the Charge Description will be listed as MERGER SAVINGS CREDIT.

The AEP Texas merger savings credit is intended to refund savings for its central division and north division related to lower debt issuance savings achieved from the AEP Texas merger approved in Docket No. 46050 – Application of AEP Texas Central Company, AEP Texas North Company, and AEP Utilities, Inc. for Approval of Merger.

Interim rates were approved effective Tuesday, August 28, 2018 that authorize AEP Texas to begin charging the rates in the Merger Savings Credit Rider beginning with the first billing cycle in September. It is anticipated that the final rates will receive approval by the Commission at a future open meeting.

The interim rates are below

 AEP Texas — Central Division Merger Savings Credit Credit Factors Effective Billing Month Of September 2018 Rate Schedule (Credit) Residential ($0.000390)/kWh Secondary <= 10 kW ($0.000519)/kWh Secondary > 10 kW IDR ($0.080403)/kW Non IDR ($0.096530)/kW Primary Service IDR ($0.089649)/kW Non IDR ($0.095814)/kW Transmission Service ($0.017126)/kW Lighting Service ($0.001296)/kWh AEP Texas — North Division Merger Savings Credit Credit Factors Effective Billing Month Of September 2018 Rate Schedule (Credit) Residential ($0.000534)/kWh Secondary <= 10 kW ($0.001100)/kWh Secondary > 10 kW IDR ($0.095150)/kW Non IDR ($0.096048)/kW Primary Service IDR ($0.074384)/kW Non IDR ($0.122846)/kW Transmission Service ($0.016298)/kW Lighting Service ($0.001983)/kWh 

You can follow specific tags with a free account and see their newest stories in one place. Sign up or sign in.

Copyright 2018 EnergyChoiceMatters.com. Unauthorized copying, retransmission, or republication prohibited. You are not permitted to copy any work or text of EnergyChoiceMatters.com without the separate and express written consent of EnergyChoiceMatters.com.

Energy Search PartnersEnd of Story BannerBefore NewNow 728 × 90New slot. Directly under the article text, at peak attention.

More News

AEP Texas Merger Savings Credit To REPs Takes Effect On Interim Basis | EnergyChoiceMatters.com