ECM, Energy Choice Matters

Informing the Industry on What Truly Matters
in Retail Energy

Sign InRegister

HomeApril 17, 2019

Delmarva Files Corrected Maryland SOS Rates For Period Beginning June 1

Email This Story

Copyright 2019 EnergyChoiceMatters.com.

The following story is brought free of charge to readers by EC Infosystems, the exclusive EDI provider of EnergyChoiceMatters.com

Delmarva Power has filed with the Maryland PSC corrected residential and Type I SOS generation rates for the period beginning June 1, 2019

The rates had been previously filed in October 2018

As previously reported, the original residential and Type I generation rates reflected an 11% decrease versus the current rates. The revisions result in a further de minimis reduction in rates.

Specifically, all of the previously filed residential and Type I generation rates for the period were erroneously inflated by $0.000982/kWh

The corrected rates below, in cents per kWh, reflect only the energy component of SOS, and not transmission or reconciliations. The incorrect ("originally filed") rates are listed for reference

Delmarva-MD Generation Rates

Residential "R" - June 1, 2019 - Sept. 30, 2019
Supply, Capacity, Energy & Ancillary Rate: 
Originally Filed        Corrected
  5.8929                  5.7947





Residential Time of Use Non-Demand "R-TOU-ND" - 
     June 1, 2019 - Sept. 30, 2019
Supply, Capacity, Energy and Ancillary Rate

           Originally Filed    Corrected
  On Peak:      5.8929          5.7947
  Off Peak:     5.8929          5.7947





Small General Service - Secondary Service "SGS-S"

Type I, June 1, 2019 - Sept. 30, 2019
           Originally Filed    Corrected
Energy Rate:    6.0429          5.9447





Separately Metered Space Heating Secondary Service "SGS-S" 
     and "LGS-S"
Type I, June 1, 2019 - Sept. 30, 2019
Supply, Capacity, Energy and Ancillary Rate: 
           Originally Filed    Corrected
                6.0429          5.9447





Separately Metered Water Heating Secondary Service "SGS-S" 
     and "LGS-S"
Type I, June 1, 2019 - Sept. 30, 2019
Supply, Capacity, Energy and Ancillary Rate: 6.0429
           Originally Filed    Corrected
                6.0429          5.9447

You can follow specific tags with a free account and see their newest stories in one place. Sign up or sign in.

Copyright 2019 EnergyChoiceMatters.com. Unauthorized copying, retransmission, or republication prohibited. You are not permitted to copy any work or text of EnergyChoiceMatters.com without the separate and express written consent of EnergyChoiceMatters.com.

Energy Search PartnersEnd of Story BannerBefore NewNow 728 × 90New slot. Directly under the article text, at peak attention.

More News

Delmarva Files Corrected Maryland SOS Rates For Period Beginning June 1 | EnergyChoiceMatters.com