ECM, Energy Choice Matters

Informing the Industry on What Truly Matters
in Retail Energy

Sign InRegister

HomeJune 21, 2016

Texas Generator To Pay $35,000 Under Settlement With PUCT Staff

Email This Story

Copyright 2016 EnergyChoiceMatters.com.

NRG Texas Power LLC would pay $35,000 under a settlement with Staff of the Public Utility Commission of Texas to resolve alleged violations of Section 39.151 of PURA and 16 Tex. Admin. Code § 25.503, related to compliance with ERCOT procedures, due to the alleged failure to install a Power System Stabilizer (PSS) under the timelines required.

Pursuant to ERCOT Operating Guide § 2.2.6(5), "if an excitation system on a synchronous Generation Resource greater than 10 MW is modified or replaced after January 1, 2008, the Generation Resource shall install a PSS, establish PSS settings to dampen modes with oscillations within the range of 0.2 Hz to 2 Hz, and place the PSS in-service."

According to the settlement, in 2010-11, for six generation resources (GRs), NRG Texas installed PSSs concurrent with Automatic Voltage Regulator (AVR) replacements for each of the six GRs as required by Operating Guide § 2.2.6(5). However, four of the six GRs did not timely place these installed PSSs in-service, with the PSSs placed in-service some 30 months after installation

The six at-issue NRG resources are THW_THWGT51 (GR 51), THW_THWGT52 (GR 52), THW_THWGT53 (GR 53), THW_THWGT54 (GR 54), THW_THWGT55 (GR 55), and THW_THWGT56 (GR 56).

Additionally, the settlement states that NRG Texas's QSE did not provide the PSS status for the six GRs to ERCOT until July 1, 2015

Docket 46079

You can follow specific tags with a free account and see their newest stories in one place. Sign up or sign in.

Copyright 2016 EnergyChoiceMatters.com. Unauthorized copying, retransmission, or republication prohibited. You are not permitted to copy any work or text of EnergyChoiceMatters.com without the separate and express written consent of EnergyChoiceMatters.com.

Energy Search PartnersEnd of Story BannerBefore NewNow 728 × 90New slot. Directly under the article text, at peak attention.

More News

Texas Generator To Pay $35,000 Under Settlement With PUCT Staff | EnergyChoiceMatters.com